|
|
|
|
Search: 
Latin American Herald Tribune
Venezuela Overview
Venezuelan Embassies & Consulates Around The World
Sites/Blogs about Venezuela
Venezuelan Newspapers
Facts about Venezuela
Venezuela Tourism
Embassies in Caracas

Colombia Overview
Colombian Embassies & Consulates Around the World
Government Links
Embassies in Bogota
Media
Sites/Blogs about Colombia
Educational Institutions

Stocks

Commodities
Crude Oil
US Gasoline Prices
Natural Gas
Gold
Silver
Copper

Euro
UK Pound
Australia Dollar
Canada Dollar
Brazil Real
Mexico Peso
India Rupee

Antigua & Barbuda
Aruba
Barbados
Cayman Islands
Cuba
Curacao
Dominica

Grenada
Haiti
Jamaica
Saint Kitts and Nevis
Saint Lucia
Saint Vincent and the Grenadines

Belize
Costa Rica
El Salvador
Honduras
Nicaragua
Panama

Bahamas
Bermuda
Mexico

Argentina
Brazil
Chile
Guyana
Paraguay
Peru
Uruguay

What's New at LAHT?
Follow Us On Facebook
Follow Us On Twitter
Most Viewed on the Web
Popular on Twitter
Receive Our Daily Headlines


  HOME | Caribbean

Puerto Ricans Start Tests on Generator for San Juan Hospital

SAN JUAN – San Juan Mayor Carmen Yulin Cruz announced on Monday the start of testing on a 2,500 KW generator to ensure power for the municipal hospital amid slow progress in repairing the damage done to Puerto Rico’s electricity grid by Hurricane Maria.

The generator, which was installed last week along with a 10,000-gallon fuel tank, will be capable of powering the emergency room, operating rooms, the laboratory, radiology and intensive-care units in the event of an outage, the mayor said in a statement.

“This is a permanent solution to the problem of instability in the electrical power system and it will avert ever again having to interrupt our services for this reason,” she said.

Maria, which struck Puerto Rico on Sept. 20 as a Category 4 hurricane, knocked out power, water and telecommunications across the US commonwealth and the process of restoration has been slow.

Puerto Rico’s government is measuring progress on the energy front in terms of the percentage of generating capacity, rather than the number of customers who have regained power.

Nearly 40 percent of generating capacity has been restored, according to authorities.

CNN, meanwhile, reported that in only four of the island’s 78 municipalities have more than half of residents seen normal electric service resumed.

 

Enter your email address to subscribe to free headlines (and great cartoons so every email has a happy ending!) from the Latin American Herald Tribune:

 

Copyright Latin American Herald Tribune - 2005-2015 © All rights reserved